Latticework by MOI Global
Presentations at MOI Global Online Conferences
Getlink: Underutilized Channel Tunnel Concession Running to 2086
0:00
-24:48

Paid episode

The full episode is only available to paid subscribers of Latticework by MOI Global

Getlink: Underutilized Channel Tunnel Concession Running to 2086

Presentation at European Investing Summit 2026

Stuart Mitchell of S. W. Mitchell Capital presented his thesis on Getlink (France: GET) at European Investing Summit 2026.

Thesis summary:

Getlink, formerly Eurotunnel, was established in 1986 with a concession to build and manage the Channel Tunnel until 2086. LeShuttle leads the Channel crossing with 35% of truck and 56% of car traffic, while Eurostar, which pays Getlink a fee for every passenger, holds 77% of London-Paris and 49% of London-Amsterdam. Stuart calls Getlink a forgotten investment: a relatively small company the sell side barely researches while investors chase AI and other hot areas.

Eurotunnel, including LeShuttle and Eurostar, earned 78% of 2025 EBITDA. Eleclink, a high-voltage cable through the tunnel that lets Britain import French nuclear power when gas prices are high, grew from nothing to 18%; Europorte freight logistics added 4%. With the investment sunk and depreciated, Getlink turned €1,595M of revenue into €347M of free cash flow, a fountain of cash. Yet the tunnel runs 450 trains on peak days against capacity of 1,000, between a half and a third of its longer-term potential.

Freight, hit by Brexit, remains 25% below 2019 levels. Stuart expects it to recover as the Border smart-border system, customs scanners checking rail freight at 20 km/h and a Sanitary and Phytosanitary Agreement cut paperwork. Ferry rivals such as Irish Ferries face a new seafarers’ wage law, emission charges and higher energy costs; Eurotunnel’s truck share rose 160 bps year over year in June 2026. New shuttles running at 160 km/h, against 100-120 km/h today, and new signaling should lift throughput.

Passenger rail is the more tangible driver. Eurostar plans 30% more capacity, Virgin Trains and Trenitalia plan to enter in 2029/2030, and a four-to-five-hour London-Frankfurt/Cologne route in the early 2030s opens a market of 3M airline and 1.7M rail passengers; Geneva, Basel and Zurich routes reach 5M more. Getlink’s chart shows passengers rising from 12M in 2025 to 22M by 2035+; Stuart thinks 30M is possible. Once a capex blip ends in about 18 months, Getlink plans to pay out essentially everything.

H1 2026 EBITDA rose 12% to €404M, and 2026 guidance was upgraded to €835M-€870M. Stuart sees the 4.5% dividend yield as too high for a super-quality asset whose cost of capital should be nearer 6%, implying a doubling in value; his DCFs point to double to triple the share price. He sees total returns of at least 9% a year, nearer 12-13% if more optimistic, and expects an eventual buyout, perhaps by Eiffage. Risks include COVID-type shocks and the guesswork in modeling new routes.


Disclaimer

European Investing Summit 2026 was held from October 20-23, 2026. The content of this website is not an offer to sell or the solicitation of an offer to buy any security. The content is distributed for informational purposes only and should not be construed as investment advice or a recommendation to sell or buy any security or other investment, or undertake any investment strategy. There are no warranties, expressed or implied, as to the accuracy, completeness, or results obtained from any information set forth on this website. BeyondProxy’s officers, directors, employees, and/or contributing authors may have positions in and may, from time to time, make purchases or sales of the securities or other investments discussed or evaluated herein.

This post is for paid subscribers